Bengaluru Power Cut Update, June 23, 2026: Several parts of Bengaluru are set to experience scheduled electricity interruptions today as Bangalore Electricity Supply Company Limited (BESCOM) undertakes maintenance, infrastructure upgrades and network strengthening works across multiple regions.

The planned shutdowns are expected to affect residential, commercial and institutional zones, with some areas facing disruptions for nearly 11 hours.
Residents have been advised to plan daily activities in advance and keep backup arrangements ready during the outage window.
Bengaluru Power Cut Timing
- 9:00 AM to 8:00 PM
- (Duration: Up to 11 hours in affected locations)
According to the maintenance schedule, power may be restored earlier if work is completed before the announced deadline.
Full List of Affected Regions And Areas
Tarabanahalli - Huralichikkanahalli Region
Timing: 9:00 AM - 8:00 PM
- Tarabanahalli
- Huralichikkanahalli
- T.B. Cross
- Hesaraghatta
- Bilijaji
- Dwarakanagar
- Nearby surrounding areas
Chikkabanavara - Maruthi Nagar Region
Timing: 9:00 AM - 8:00 PM
- Chikkabanavara
- Maruthi Nagar
- Ganapathi Nagar
- Shanthinagar
- Brothers Colony
- Krishna College Road
- Raghavendra Layout
- Nearby localities
Dasanapura - Thotagere Region
Timing: 9:00 AM - 8:00 PM
- Dasanapura
- Thotagere
- Hosahalli Palya
- Bavanne Devasthana surroundings
- CDPO area
- Danish Farm
- KMF
- Guni Agrahara
- Nearby areas
Shivakote - Mavallipura Region
Timing: 9:00 AM - 8:00 PM
- Ganigarahalli
- K.T. Pura
- IIHR Ivarakondapura
- Seethakempanahalli
- Linganahalli
- Madappanahalli
- Kalenahalli
- Shivakote
- Mavallipura
- Kondethimmanahalli
- Adjoining areas
Acharya College Road - Soladevanahalli Region
Timing: 9:00 AM - 8:00 PM
- Kurubarahalli
- Pakegowdanapalya
- Raghavendra Dhama
- Bylakere
- Acharya College Main Road
- Achyuth Nagar
- Soladevanahalli
- Nearby localities
Additional Areas Reported Under BESCOM Maintenance Zones
- Lottegollahalli
- Munishamappa Layout
- R.K. Garden
- Sanjeevappa Layout
- MLA Layout
- Netaji Nagar
- Pipeline Road
- Mattikere
- Mohan Kumar Nagar
- J.P. Park
- Akkiyappa Garden
- B.K. Nagar
- LIG Colony
- Pampa Nagar
- Yeshwanthpur
- HMT Layout
- Gokula 1st Stage
- Indian Institute of Science (IISc) surroundings
- M.S. Ramaiah (MSR) Block
- BHEL area
- IISc Training Centre
- Ambedkar Nagar
- Divanara Palya
- Model Colony
- Sharif Nagar
- Kollapuriamma
- Divya Shanthi
- Govindapura
- Kaveri Nagar
- Brindavan Nagar
- Gandhi Nagar
- Hegde Nagar
- Chandrika Soap Factory surroundings
Why Is BESCOM Conducting These Shutdowns?
According to the maintenance advisory, the outages are intended to:
- Carry out preventive maintenance
- Upgrade electrical infrastructure
- Strengthen network reliability
- Improve long-term power stability
- Reduce chances of unplanned outages
Advisory For Residents
Residents in affected areas are advised to:
- Charge phones, laptops and backup devices beforehand
- Store water if dependent on electric pumps
- Keep emergency lighting available
- Plan work-from-home schedules accordingly
- Avoid using elevators during outage periods
Bottom Line
Bengaluru's scheduled power shutdown on June 23, 2026 will affect multiple areas and surrounding neighbourhoods, with outages expected between 9 AM and 8 PM. Residents are advised to stay prepared and follow local restoration updates from BESCOM.



Click it and Unblock the Notifications