Search
» »Bhopal Power Cut Today (July 15, 2026): About 63+ Areas to Face Scheduled Outage; Check Full List

Bhopal Power Cut Today (July 15, 2026): About 63+ Areas to Face Scheduled Outage; Check Full List

Residents across several parts of Bhopal should prepare for scheduled power outages on Wednesday, July 15, as the Bhopal Electricity Company carries out maintenance and infrastructure works at multiple locations across the city. According to the official shutdown schedule, electricity supply will remain suspended in more than 63 localities, with outages ranging from two to six hours depending on the area and the nature of the work.

Bhopal Power Cut Today July 15 2026 About 63 Areas to Face Scheduled Outage Check Full List
Photo Credits: AI

The maintenance activities include DTR charging, line maintenance, and pole rectification, aimed at improving the reliability and safety of the city's power distribution network.

Areas Affected by Today's Bhopal Power Cut

6:00 AM to 8:00 AM
Work: DTR Charging Service

  • Star Line Automobiles
  • RMJ Motors
  • Surjeet Automobiles
  • MGM Industries
  • Gupta Engineering
  • DB Infratech Pvt. Ltd.
  • Sokhi Brothers
  • HL Passi Engineering
  • SK Industries
  • Champion Engineering PT-II
  • Kamini Agarwal
  • Perfect Paper Product
  • SRD Steel Pvt. Ltd.
  • Ocean Motor Pvt. Ltd.
  • CI Automotors Pvt. Ltd.

10:00 AM to 2:00 PM
Work: Line Maintenance

  • Pragati Complex
  • Depot Square
  • Shastri Nagar
  • Apex Bank
  • Jeevan Vihar
  • Annapurna Complex
  • Income Tax Colony
  • Government Quarters
  • Geetanjali Complex and Shops
  • Hajela Hospital
  • Sonia Gandhi Complex

Also affected during the same time:

  • Tilak Nagar
  • Laxmi Complex
  • Chandrika Nagar
  • Priyadarshini
  • Fortune Glory Phase I & II
  • Gujarati Colony
  • DK Cottage
  • Dream Glory
  • Lotus Phase I
  • Nearby localities

Additional localities:

  • Tribhuvan Colony
  • Ramayan South Avenue Phase I & II
  • Signature City
  • Shiv Kasturi Vatika
  • St. Francis Co-Ed School
  • Nikunj Heights
  • Shankaracharya Bhagwa Mahal
  • Surrounding areas

10:00 AM to 4:00 PM
Work: Straightening bent electricity poles

  • Jai Krishna
  • Dharam Kanta
  • Malikheri
  • Shabri Nagar
  • Piplia Baj Khan
  • Vijay Nagar
  • Patel Nagar
  • Shukla Farm House
  • Vijay Market
  • Bihari Basti

Additional affected localities:

  • Coral Casa Society
  • Mittal College
  • Awasthi Farm
  • Regal Estate
  • St. Jude Educational Society
  • Royal Homes
  • Sukh Sagar
  • BDA Colony
  • Chitrakoot

Why Is There a Power Cut Today?

The scheduled shutdown has been announced to facilitate essential electricity infrastructure works, including DTR charging, routine line maintenance and rectification of damaged or bent power poles. These preventive measures are carried out to improve the stability of the power distribution network and reduce the chances of unexpected outages in the future.

Advisory for Residents

Residents in the affected areas are advised to charge mobile phones, laptops and other essential devices in advance and plan their day around the scheduled outage timings. While electricity is expected to be restored after the maintenance work is completed, restoration may vary slightly depending on field conditions. Consumers are also advised to cooperate with electricity department personnel during the maintenance operations.

More News

    Read more about: bhopal
    Notifications
    Settings
    Clear Notifications
    Notifications
    Use the toggle to switch on notifications
    • Block for 8 hours
    • Block for 12 hours
    • Block for 24 hours
    • Don't block
    Gender
    Select your Gender
    • Male
    • Female
    • Others
    Age
    Select your Age Range
    • Under 18
    • 18 to 25
    • 26 to 35
    • 36 to 45
    • 45 to 55
    • 55+