Search
» »Mumbai Power Cut on April 28, 2026: Area-wise Schedule, Timings and Key Details

Mumbai Power Cut on April 28, 2026: Area-wise Schedule, Timings and Key Details

Residents in parts of Mumbai and Thane may experience temporary power disruptions on April 28, 2026, due to scheduled maintenance and infrastructure-related work carried out by major electricity providers, including Maharashtra State Electricity Distribution Company Limited and Tata Power.

Mumbai Power Cut on April 28 2026 Area-wise Schedule Timings and Key Details
Photo Credits: AI

According to the latest available schedule, these outages are planned and will affect select zones for a few hours during the morning.

Power Cut Timings and Regions

Power supply interruptions will occur at different time slots depending on the service area:

MSEDCL - Mumbai/Thane Region

  • Timing: 7:00 AM to 11:00 AM
  • Areas Affected: Peripheral areas and distribution circles under Mumbai and Thane administration, including select zones across both regions

Tata Power - North Mumbai Service Area

  • Timing: 6:30 AM to 9:00 AM
  • Areas Affected: Parts of F Block, Sector 1 (linked service zones) and nearby localities in North Mumbai

Tata Power - Mangolpuri Service Area

  • Timing: 8:00 AM to 10:00 AM
  • Areas Affected: Portions of Mangolpuri Industrial Area (MIA) and surrounding service zones

Additional Tata Power - North Mumbai Zones

  • Timing: 8:00 AM to 10:00 AM
  • Areas Affected: Select pockets across North Mumbai service regions

Areas Likely to Be Impacted

The outages will primarily affect:

  • Peripheral residential zones in Mumbai and Thane
  • Industrial pockets such as Mangolpuri Industrial Area
  • Select sector-based localities in North Mumbai
  • Distribution circles managed under MSEDCL

While not all neighbourhoods will face disruptions, residents in the above-mentioned zones should remain prepared for temporary outages lasting between 2 to 4 hours.

Reason for Power Disruption

The scheduled shutdown is part of routine line maintenance, system upgrades, and conductor-related work aimed at improving long-term electricity reliability. Such planned outages are essential for strengthening infrastructure, reducing unexpected breakdowns, and ensuring stable supply in the future.

What Residents Should Expect

  • Short-duration outages during early morning hours
  • No major city-wide blackout, only localized disruptions
  • Power restoration expected immediately after maintenance work is completed

Advisory for Residents

Residents and businesses in affected areas are advised to:

  • Plan essential activities in advance
  • Charge electronic devices beforehand
  • Keep backup lighting options ready
  • Avoid using elevators during outage windows if possible

Conclusion

The April 28 power cut in Mumbai and Thane is a planned and temporary measure to support ongoing maintenance and infrastructure improvements. While the disruptions are limited to specific areas and time slots, being informed and prepared can help residents manage the situation smoothly without inconvenience.

More News

Read more about: mumbai maharashtra thane
Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+