Search
» »Bhopal Power Cut on May 4, 2026: Over 25 Areas to Face Scheduled Outage

Bhopal Power Cut on May 4, 2026: Over 25 Areas to Face Scheduled Outage

Bhopal: Several parts of Bhopal will witness scheduled power cuts on Monday, May 4, 2026, due to maintenance and line work undertaken by the local electricity department. The outages are expected to last between four to six hours, depending on the area and the nature of the work being carried out.
The planned shutdown is part of routine infrastructure upgrades aimed at improving long-term power supply reliability. However, residents across multiple localities are likely to face temporary inconvenience during the day.

Bhopal Power Cut on May 4 2026 Over 25 Areas to Face Scheduled Outage
Photo Credits: AI

Time and Area Schedule

9:00 AM to 2:00 PM

  • Vineet Kunj A Sector, CI Heights, Sai Steel, Aina Bungalow, Rajharsh Colony, Banjari D Sector and nearby areas

10:00 AM to 4:00 PM

  • Anand Nagar Square, Shankar Garden, Rajiv Gandhi Colony, New Mandi area, Police Chowki surroundings, Gupta Colony, Ratnagiri Tiraha

10:00 AM to 2:00 PM

  • Jatkhedi, Khanjar Mohalla, 16 Acre locality, Bagh Mugalia Basti, Bhawani Nagar and surrounding areas

10:00 AM to 4:00 PM (extended zones)

  • Jeevan Dhara Hospital area, Dev Mata Hospital vicinity, Rajiv Nagar (B and C sectors), Tanatan Dhaba stretch and nearby pockets

In addition, smaller connecting neighbourhoods and adjoining streets around these locations will also experience power interruptions.

What Residents Should Know

Authorities have advised residents to plan essential activities in advance, particularly those dependent on electricity such as water pumping, business operations, and household chores. Since some outages may extend up to six hours, keeping backup arrangements like charged devices and water storage ready is recommended.

Why the Power Cut?

The outage is linked to line maintenance, system upgrades, and infrastructure strengthening. Such scheduled work is typically carried out to prevent unexpected breakdowns, especially during peak summer demand when electricity consumption rises sharply.

Final Outlook

While the scheduled power cut on May 4 will affect daily routines in several parts of Bhopal, it is a planned and temporary measure. Normal supply is expected to resume promptly after the maintenance work is completed. Residents are encouraged to stay updated through local electricity board notifications for any last-minute changes in timing or coverage.

More News

Read more about: bhopal
Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+