Residents across several parts of Bhopal are expected to face scheduled power interruptions on May 17, 2026, due to infrastructure and maintenance work being carried out by the electricity department and associated agencies. According to the schedule reviewed, power supply will remain temporarily suspended in multiple colonies, market areas and commercial zones because of activities including NHAI line shifting, metro-related construction work, pole erection and routine line maintenance.

Authorities have advised residents and businesses to make necessary arrangements in advance, particularly for activities dependent on uninterrupted electricity supply.
Why Is The Power Supply Being Interrupted?
The scheduled shutdown has been planned for multiple technical works taking place across the city.
Major reasons include:
- NHAI line shifting work
- Metro construction and metro line shifting activities
- Pole erection and construction work
- Routine line maintenance operations
These activities are intended to improve infrastructure and ensure better operational efficiency of the electricity network.
Areas Expected To Be Affected And Timings
Power interruptions are expected at different time slots depending on the nature of work being carried out.
Morning Shutdown: 6:00 AM to 12:00 PM
- Sagar Banglow
- BDA area
- Gondipura
- Banjara Basti
- New Jail surroundings
- Reason: Line maintenance work
Morning Shutdown: 7:00 AM to 12:00 PM
- Old PHQ
- Rustam Parisar
- Nearby localities
- Reason: Metro construction work
Power Interruption: 8:00 AM to 2:00 PM
- Brij Colony
- Maya Enclave
- Karond Square
- Ciae Nabibagh
- Nishatpura Thana area
- Gas Rahat area
- Maulana Azad Hospital surroundings
- Main Road and adjoining locations
- Palasi Village
- Elder Green
- Nice Speech Colony
- Rajnagar Palasi
- Prince Paradise
- Reason: NHAI line shifting work
Midday Shutdown: 10:00 AM to 12:00 PM
- Govindpura Market
- Govind Garden Colony
- Govindpura region
- Reason: Metro line shifting work by AFCON
Shutdown: 10:00 AM to 1:00 PM
- Batra Hospital area
- Manohar Dairy surroundings
- Shri Vatika Hotel zone
- Kargil Nagar
- Sangat Plaza
- Pappu Bakery area
- Hotel Rewa locality
- Divya Steel area
- BDA residential sections
- Bhopal Medical zone
- Thaddaram Complex
- Hotel Residency
- Alaknanda Complex
- Citi Centre
- Vishal Mega Mart surroundings
- Amar Stambh
- Nai Duniya
- Manav Parisar
- Purjor House
- Agnibaan
- Drishti Offset
- Reason: Line maintenance work
Shutdown: 1:00 PM to 4:00 PM
- C, D, F and G sectors
- Star Line Automobile
- Alert Engineering
- Champion Engineering
- Ravi Engineering
- MGM Engineering
- Surendra Engineering
- Precision Engineering
- Star Delta Transformer Unit-II
- Saaran Industries
- RMJ Motors
- Surjeet Automobile
- Reason: Pole erection and construction work by STC
Shutdown: 9:00 AM to 1:00 PM
- Balvihar Chari
- Laxmi Talkies Road
- Saraey Laxmi Talkies area
- Raja Ji Kuwa
- Nehru Road
- Beldar Pura
- Old Saifia College Road
- Ali Ganj
- Jumerati
- Dr Ajwani Hospital area
- Paliwal Nursing Home surroundings
- Bank of India area
- Hamidiya Road
- Ibrahim Ganj
- Sajjad Colony
- Balvihar
- Dawa Bazar
- Bus Stand area
- Chetan Market
- Malik Market
- Reason: Line maintenance work
Advisory For Residents
Residents are advised to charge electronic devices in advance and make arrangements for essential services, especially in households with medical equipment requirements or work-from-home needs. Businesses operating in affected commercial zones may also need to plan their schedules according to the announced shutdown timings.
As the interruptions are scheduled and linked to maintenance and infrastructure work, electricity supply is expected to resume after the completion of the respective activities in each affected area.



Click it and Unblock the Notifications