Search

01430 Hdp Lur Sf Spl Timetable and Route

Class - 1A 2A 3A SL

M

T

W

T

F

S

S

The Hdp Lur Sf Spl (01430) is a vital rail service connecting Hadapsar (Chinchvad) to Latur (Latur), catering to both daily commuters and long-distance travelers. Covering a journey of approximately 330 km, this train passes through key stations, offering a reliable travel option between Chinchvad and Latur. Whether you're traveling for work or leisure, the train's scheduled departure and arrival timings ensure a smooth and well-planned journey.Whether you’re checking schedules, routes, or finding everything you need in one place. With dynamic updates, you can stay informed about any changes in timings, routes, and other essential details.

Search between Stations

Search by Train

Search by Station

Search between Cities

Station Arrive Depart Distance Platform Day
Hadapsar (HDP) Starts 16:05 0 Km 1
Daund Jn (DD) 17:10 17:12 70 Km 1
Jeur (JEUR) 18:13 18:15 144 Km 1
Kurduvadi (KWV) 18:30 18:32 178 Km 3 1
Barsi Town (BTW) 19:12 19:14 215 Km 1
Usmanabad (UMD) 19:49 19:51 251 Km 1
Harangul (HGL) 20:40 20:42 321 Km 1 1
Latur (LUR) 21:20 End 330 Km 1

Train Route, Timings & Distance

Covering a distance of approximately 330 km, the Hdp Lur Sf Spl follows a well-structured route with multiple important stops along the way. Passengers can check real-time departure and arrival timings to plan their journey effectively. The train operates on a scheduled timetable, ensuring a smooth and timely travel experience.

Class Details

The train offers multiple class options, including First AC (1A),Second AC (2A),Third AC (3A),Sleeper (SL) catering to different passenger needs and budgets. Whether you prefer an air-conditioned journey or an economical travel option, the Hdp Lur Sf Spl ensures a comfortable ride with essential onboard facilities.

Latur - The Cultural Crossroads with a Historic Railway Legacy

Latur, renowned for its agricultural prosperity, has a fascinating railway history pivotal to its growth. Railways were introduced in 2007, marking a significant economic shift. Notable stations include Latur Railway Station, Latur Road Junction, and Harangul Railway Station. These stations drive Latur's connectivity and regional trade. The inaugural line, inaugurated in 2007, bolstered trade, linking agricultural markets across Maharashtra. Rail development sparked local infrastructure growth, integrating Latur into Maharashtra's railway map. Latur's culture reflects a blend of traditions, showcased in landmarks like Udgir Fort and the Nana Nani Park. As railways modernized, station amenities improved, enhancing travel convenience. Latur's strategic rail connectivity stimulates tourism and economic activities. Today, it stands as a testament to how railways propel regional development, offering a bridge from historical roots to the contemporary era. Latur maintains its cultural essence while thriving as a crucial railway node.

Chinchvad to Latur - Hdp Lur Sf Spl (01430) Train Timings

Hdp Lur Sf Spl (01430) is a popular train connecting Hadapsar (Chinchvad) to Latur (Latur) .This train provides a comfortable journey with multiple class options, ensuring a smooth travel experience.

  • Departure Station: Hadapsar (HDP)
  • Departure Time: 16:05 (04:05 pm)
  • Arrival Station: Latur (LUR)
  • Arrival Time: 21:20 (09:20 pm)
  • Distance Covered: 330 km
  • Running Days: Mon,Fri (Confirm exact days before booking)
  • Classes Available: First AC (1A),Second AC (2A),Third AC (3A),Sleeper (SL)

The train passes through key stations like Hadapsar, Daund Jn, Jeur, Kurduvadi, and Barsi Town. Passengers can check real-time updates, seat availability, and booking details on official railway portals.

Frequently Asked Questions

What is the departure time of 01430 Hdp Lur Sf Spl?

Accordion Arrow

The 01430 Hdp Lur Sf Spl departs from Hadapsar (HDP) at 16:05 hrs (04:05 pm)

What is the arrival time of 01430 Hdp Lur Sf Spl at Latur?

Accordion Arrow

The train arrives at Latur (LUR) at 21:20 hrs (09:20 pm)

What is the total journey duration of 01430 Hdp Lur Sf Spl?

Accordion Arrow

The total journey time is 5h 15m, covering approximately 330 km.

What are the major stops of 01430 Hdp Lur Sf Spl?

Accordion Arrow

Major stops include Hadapsar,Daund Jn,Jeur,Kurduvadi,Barsi Town,Usmanabad,Harangul,Latur before reaching Latur

What classes of travel are available on 01430 Hdp Lur Sf Spl?

Accordion Arrow

The train offers First AC (1A),Second AC (2A),Third AC (3A),Sleeper (SL)

How frequently does 01430 Hdp Lur Sf Spl run?

Accordion Arrow

It runs Mon,Fri

How can I check real-time running status of 01430 Hdp Lur Sf Spl?

Accordion Arrow

You can check real-time status on NTES (National Train Enquiry System), IRCTC app, or via SMS by sending "12301" to 139.

What is the average speed of 01430 Hdp Lur Sf Spl?

Accordion Arrow

The train runs at an average speed of 66 km/h.